Name
Transforming Power at Tropicana Gold Mine
Date & Time
Tuesday, May 6, 2025, 11:00 AM - 11:20 AM
Vicky Scobie Matt Duxbury
Description

This joint case study will provide both the miner’s and the independent power producer’s (IPP) perspectives on Tropicana Gold Mine’s groundbreaking shift to hybrid power.

  • The Miner’s Perspective: key drivers behind integrating 61MW of renewables and battery storage with existing gas power systems—creating Australia’s largest off-grid hybrid power station
  • Lessons learned from incorporating renewables at the site
  • How the project aligns with AngloGold Ashanti’s net-zero carbon goals
  • The IPP Perspective: Technical and commercial considerations for delivering this large-scale hybrid power solution  
  • Insights from integrating renewables and storage into existing thermal infrastructure
  • Key takeaways for future off-grid hybrid energy projects in the mining sector
Session Type
Joint Case Study
Location
BELLEVUE 1 - MAIN STAGE